Day: December 17, 2022

Waste Heater Design TS150 PLC, Review (adsbygoogle = window.adsbygoogle || []).push({}); Construction is dual/double combustion chamber with 02 sets oil burner, batch load  incineration equipment. Waste feed chamber is 1570Liters (1.57m3, TS150 PLC).  Primary & Secondary combustion chambers and smoke filter chamber.  Batch load on the bottom of chamber. Incinerator PLC panel control suit for […]
Recent Posts