20kgs per hour incinerator

The manufacturer must offer a statement that the pressure vessel is manufactured in accordance with applicable

guidelines for pressure equipment.

 

After accompanying files should be provided with the treatment system and shall be accessible at the Site:

 

1. Operation instructions (including procedure description).

2. Loading and maintenance procedures.

3.Short-form of operation and loading procedures. P&I diagram, circuit plan, technical data sheet, pressure vessel certificate.

 

A3) Technical Specification: Medical Waste Shredder

 

Capacity: Should be 150 liters.

 

Should be capable to shred up to 100 gallons of the waste that is treated.

 

 

 

The tech ought to be capable to take care of hospital waste including sharps such as needles, lancets, scalpels and soft

materials like bandages.

 

Need to leave the waste to become unrecognizable.

 

After accompanying files must be provided with the treatment system and shall be available at the Site:

 

1. Operation instructions (including process description.

2. Loading and maintenance procedures.

 

3.Short-form of operation and loading procedures.

 

 

 

  1. Deliverables:

The Bidder will be responsible to deliver and install all of the components to be provided with the equipments at the waste

tackling region at destination hospital(s) in the Republic of Kenya. The Bidder shall send a time program before

and throughout the complete construction and construction interval.

 

ACCOMPANYING DOCUMENTS

 

The following accompanying documents must be provided with EACH of the delivered incinerations:

 

1. Two (2) full performance instruction manuals (including procedure description; loading and maintenance processes ) in the

English language. Three (3) short-form records of operation and loading procedures (English Language).

 

3. Circuit and pneumatic plan, technical data sheet, pressure vessel certificate (English Language). One set of safety regulations (English language).

 

5. Set of necessary safety signs.

 

All files must also be provided on CD (one CD per treatment system) in digital form in the English language.

4.One set of safety regulations (English language).

 

5.Set of necessary safety signs.

 

All documents must also be provided on CD (one CD per treatment system) in digital form in the English language.

Categories:

Recent Posts