250kgs per Individual resources Capability waste incinerator

A part of brief article burning of gases

is dual/double combustion chamber with 02 units oil burner, batch load incineration equipment. 
Waste feed chamber is 1800Liters (1.8m3, TS250 PLC). Primary & Secondary combustion chambers
and smoke filter chamber. Batch load on the bottom of chamber. Incinerator PLC panel control suit for local operation. 

* A heating system of burning of gases,

* A gadget of shot of atmosphere making it possible to get a total recombustion of gases,

* A apparatus of air inlet of air conditioning of waste gases,

* A sheath of draining of the gases charred.

* Carcass in strong sheet steel with assistance of internet connection.

* Structure of the refractory;

・ Refractory concrete:

§ Thickness: ≥ 150 mm

§ Character: 65% of Al203

・ Protect in rugged panel:








§ Thickness: ≥ 85 mm

Character: Magnesium

(adsbygoogle = window.adsbygoogle || []).push({});

Burner Design TS250 PLC, Review

This layout is small waste incineration tools for little waste effect. Construction

Key Product Listing per 01 collection

Key Burning Chamber

Extra Combustion Chamber

Smoke Filter Chamber

Incinerator PLC Control Circumstances

Smokeshaft:10.0 Meters

*( update to Stainless-steel, complimentary cost)

Italy oil/gas heater: 02 systems

Oil Container (if oil fuel): 300Liters

Items/Model

TS200( PLC)

Picture

Rule

Solid Waste Incineration Therapy

Melt Price

Average 250 kg/hour

Feed Ability

Requirement 350kg/feeding

Control Establishing

PLC( Programmable Logic Controller Burner)

Burning Chamber

1800L

Internal Measurements

150x110x110cm

Secondly Chamber

750L

Smoke Filter Chamber

Yes

Feed Mode

Handbook

Voltage

220V

Electricity

0.9 Kw

Oil Intake (kg/hour)

Common 28

Gas Usage (m3/hour)

Typical 33.6

Temperature Level Screen

Digital Present

Temperature Level Degree Security

Yes

Oil Tank

300L

Feed Door

80x60cm

Smokeshaft

10Meter

Smokeshaft Kind

Stainless-steel

1st. Chamber Temperature Level

1000 ℃ -1200 ℃

Residency Time

2.0 Sec.

Gross Weight

8500kg

Exterior Dimensions

300x160x190cm

Heater procedure should certainly be Automatic On/Off

Gas: diesel

The supplier need to supply desired details for the top of the installation

This burner using “PYROLYTIC” burning need to have:

;

・ Refractory Home:

§. Thickness: ≥ 100 mm

§. Nature: 42% of Al203

・ Protect in primitive panels:

§. Thickness: ≥ 75 mm

・ Character: Magnesium silicate.

* Heater of illumination of waste, with gas, average mono-bloc casting directing diving flame, lights and also security and security of digital ignition, permanent air flow, electro-magnetic sluice entrance of guideline in addition to isolating valve.

* Plate of trimming in Carborundum, remaining clear of those taking care of glass together with slags.

|



A part of brief article burning of gases

Categories:

Recent Posts