|
Machine Working Placing |
Oil or Gas + Ability |
Voltage |
220V |
Oil Use (lit/hour) |
Average 13.3 lit/hour/chamber |
Gas Intake (NG) (m3/hour) |
16.0 (m3/hour) (NG) |
Gas intake (LPG) (m3/hour) |
11.7 (m3/hour) (LPG) |
Burning rate |
Regular 30kg/hour |
Feed setting |
Hand-operated |
Key Combustion chamber |
360 Liters |
Second Burning chamber |
200 Liters |
Combustion Chamber Product |
Refractory Concrete Cement+ firebrick |
Interior Measurements |
Yes (Main chamber) |
Outside measurements |
210x120x210cm( with No smokeshaft) |
Door opening |
48X60 centimeters |
Fuel Kind |
Diesel Oil/ Gas/ LPG |
Burner |
Initial |
Smokeshaft size |
13.0 Meters |
Smoke filter chamber |
Yes |
Temperature monitor |
2 number Digital Show |
Temperature level Defense |
Yes |
Oil container |
200L |
Burning Performance |
>> 98 Percent |
Chimney type |
Stainless-steel |
1st. |
800c– 1000c |
second. Chamber temperature degree |
1000c– 1200c |
Residency time |
2.0 sec. |
Gross weight |
4000kg |
Electric Plastic as well as glasses Shredder |
Yes |
Scrubber |
Yes |
Service Warranty Stage |
1. Year |
Main combustion chamber |
Yes |
Secondary burning chamber |
Yes |
Incinerator control scenario |
S. steel |
Incinerator chimney |
Initial |
Gas Heater |
Yes |
Oil Storage tank ability |
Yes |
Oil Stand assistance |
Yes |
Dry Smoke Filter Chamber |
Yes |
Air Follower |
Yes |
Total waste incineration capacity/time |
Minimum 60KG
for Ministry of Public Wellness, Kabul, Afghanistan
Tel: +86-25-8461 0201
Website: www.hiclover.com
Email: [email protected]
Email: [email protected]