Biomedical Waste Heater, 10-15 KG.

The first is that a little
Shall provide appropriate capacity of oil storage tank.
Destruction Efficiency: 99%.{
(adsbygoogle = window.adsbygoogle || []).push({});|}
Waste Charging: Manual & Automatic waste charging.
The bidder should arrange for the equipment to be installed and commissioned by accredited or
thermo coupler.
Material: Refractory bricks affirming to international standard.
I.D. Fan:
Waste Charging: Manual & Automatic waste charging.
Incinerator:
The Biomedical Waste Incinerator is utilized for Incineration of every Kind of Biomedical Waste.
The system provided will be designed to keep and to function normally under the requirements of
Drive: Bel
Switches required for installation & commissioning of the equipment.
It will have audio-visual alarm program.
Must specify the quantity of each item contained in their offer (such as items not specified
Burner: Monoblock fully automatic leftovers.
It will have separate digital display of temperature for both chambers.
Emergency Stack:
Piping : PPR
Insulation depth: approx.115mm thick
Material of Construction: Mild steel.
above).
The Disposal of such Biomedical waste is a very important as it is a dangerous wastes for
User Training
It will have to Decrease flue gas temperature before venturi scrubber.
It will come with petrol oil level indicator, piping with valves & N.R. valve.
Type: Cyclonic
System Configuration
CE or USFDA approved merchandise certification.
Second is a 500kg per/hr incineration for a business planning to start a
The bidder will submit the details of BOQ of civil and electrical works.
Fuel: Diesel
Epoxy powder coated washable paint finish.
Type: Centrifugal
Power supply: 220-240 VAC, 50Hz single phase/400 — 420 VAC, 50Hz three phase as
Insulation depth: approx.115mm
Biomedical Waste Incinerator, total unit.
%CO2 + %CO
Max Nitrogen dioxide    400mg/m3
Gas Retention in Secondary Chamber : 2 secs{
(adsbygoogle = window.adsbygoogle || []).push({});|}

Documentation
List of important spare Components and accessories together with their part number and breaking.
Emission Standards: Reduce emission rates are favored.
Must provide user training (including how to use and maintain the gear ).
Ash Removal: Manual/automatic
Shall provide ladder until the top.
User (Running ) manual in English.
The combustion efficiency (CE) will be at least 99.00%.
Consumption certification:
Volatile organic chemicals in ash will not be more than 0.01 percent.
Program: To separate water droplets from flue gases
All standard tools and lubrication and cleaning materials, to be contained in the deal.  Bidders
The combustion efficiency is computed as follows:
It will have gas consumption tracking system.
Primary Chamber:
Service (Technical / Maintenance) manual in English
Manufacturer:
Secondary chamber gas residence time shall be minimum 1 second at 1050 oC.
Certificate of calibration and review from factory.