1.
4. Stipulation of upkeep and procedure manuals and drawings complete with upkeep schedule and guidelines.
5. Gas petroleum storage tank- moderate steel1500 litres capacity
6. Onsite training for surgery as well as maintenance team.
CRUCIAL
6. The stack/chimney.
M ) The smokeshaft should be visible to the driver from the feeding place.
G) The average dioxin and also furan concentration in the exhaust must not proceed beyond 80mg/m3 complete dioxins and furans if necessary to get a duration of 6 to 16 hrs.
– – Guidebook technological observation is sent with the equipment with all explanations of failings as well as resolutions.
B) The room should guarantee a minimum leave temperature amount of 850 levels centigrade.
2.4 Secondary Burning Chamber (After burner)
a) ought to be fitted with heaters which use low sulphur gasoline.
F) Guarantee both main as well as second combustion temperature levels are preserved up until all waste is completely ignited. The particulate collectors may include some of the complying with or a mix thereof:.
5. Acid gas scrubbers.
2. Feed chamber/charging
B) Electrostatic precipitators.
8.
C) Textile filters.
1. Provide, mount as well as create a burner as given in the technical specs
E) A strong particulate meter/recorder should be provided.
B) Guarantee second air supply is controlled.
O) The purpose of dimension of releases will probably be offered.
2.7 Instrumentation
a) Instrument for figuring out the interior wall temperature and also not burner fire temperature must be attended to both crucial and also secondary chambers.
C) The secondary room gas home time will go at least 1 2nd in 1050 +/- 50 degrees centigrade with 3 percent oxygen in the stack gas.
2.3 Major Burning Chamber.
a) This room need to be outfitted with burners which make use of low sulphur gasoline.
Regulated sterile mechanical feeding that does not negatively influence the atmosphere temperature degree in the key and also second chambers of the burner will be used.
1. Complete plant format
a) Cyclone separator.
E) Make sure the discharged oxygen net content of the emitted gases is not less than 11%.
Incineration manufacturers To allow the Employer undertake definitive evaluation of the tender, tenderers are requested to send with their deals the comprehensive specifications, including illustrations and catalogues with commissioning and maintenance instructions for your Burner they want to supply, setup and commission. Tenderers that fail to obey this need entirely will have their tenders denied. 2. TECHNOLOGICAL REQUIREMENTS OF THE necessary INCINERATOR
2.1 General Summary
The plant must have four distinct sections that show 3 concepts of turbulence, house time and also temperature level retention. The managed regions may include however not limited to:
N ) The minimum leave rate need to be 10 metres per second as well as at minimum twice the encompassing wind speed (Efflux rate = end speed x 2) whichever is greater to ensure no down cleanup of leaving gases.
3. Key combustion chamber
D) Opacity of the smoke need to never surpass 20% seen by 50 metres with naked eyes.
B) A distinct and also visible alarm need to be mounted to alert the operator once the second room temperature level goes down to recorded below the called for temperature.
7. Minimum capability of crucial chamber = 0.18 cubic metres
E) All the discharge into the atmosphere besides vapor or water vapour ought to be rancid and without mist, fume and beads.
2.6 Chimney/Stack
l) The chimney should have a minimal elevation of 10 metres above ground level as well as apparent the acme of the construction by not less than 3 metres to get many roofs. The topography as well as elevation of adjoining structures within 50 metres radius must be taken into account.
C) A carbon monoxide gas as well as oxygen meter/recorder ought to be offered
d) A smoke depth meter/recorder need to be provided.
9. Ought to have a complete size counterbalance loading door enabling very easy access to the main chamber for loading as well as removing ash.
F) Any sort of various other tool which may be taken into consideration essential.
Offer, Installation and also Appointing of An Incinerator in Eastern Hydros [Page 28
2.2 Feeding and also Charging
2.9 Exhaust Purview
a) Combustion performance (C.E) shall go to the very least 99.00% where C.E = %Co2 x 100/ [% Co2 + carbon monoxide gas] b) The temperature level of the primary chamber will be 800 +/- 50 degrees centigrade.
c) The secondary chamber gas home time shall go to least 1 2nd at 1050 +/- 50 degrees centigrade with 3% oxygen in the stack gas.
d) Opacity of the smoke need to not surpass 20% seen from 50 metres with naked eyes.
e) All the discharge to the air apart from vapor or water vapour should be odorless and without mist, fume and beads.
f) A 99.99% destruction and elimination performance (DRE) for every primary natural dangerous component (POHC) in the waste feed where DRE [( Success – – Wout )/ Win] x 100 where Success = mass feed rate of the POHC in the waste stream fed to incineration and Wout = mass emission rate of POHC in the stack before the release to the atmosphere.
g) The average dioxin and also furan concentration in the exhaust must not go beyond 80mg/m3 total dioxins and furans if gauged for a duration of 6 to 16 hrs.
– – Guidebook technological monitoring is shipped with the equipment with all explanations of failings as well as resolutions.
Capacity/island: 4000 kg/day; 25000 kg/day; 31000 kg/day; 48000 kg/day
Burning temperature– over 12000C
Two chambers– minimum
Exhausts– dioxin and also hefty metaly– much better then Kyoto procedure
Emission– monitoring system
Waste unloiding– directly from waste track to incineration