Burners

drop between 5000-10000 kg per hour.Mostly waste from petroleum storage tanks. Building and construction, installment and 6 weeks upkeep expense including specifications.CMSD for Dual Chamber Rotating Klin Kind Incinerator (1st Chamber temperatur less than 850 level centrigrade & & 2nd Chamber Temperature Level less than 1200 c with exhaust pipeline 100 meter long with release gasoline filtering mechanics ), Hydroclave (Clinical) with anciliary devices operating standards: Temperature 250-275 degree feren, Pressure 15-35PSI, Sanitation time 30 minus, Set capability -463 kg. 2 Burners for a healthcare facility in VN. The anticipated ability is approximately 1,000 kg every day.

Categories:

Recent Posts