The bulk oil storage tank shall have a capacity of 10,200 litres and be placed at 0.5 m above ground on a firm concrete cradle, total with the following:-.
– Electrical circuitry in the neighborhood isolator.
– Ash door.
– Gain entry into the top of the storage tank.
The incineration will have chimney, castable high quality refractory mobile lining in addition to burner shell, perforated blind for the main in addition to additional combustion chambers and air blood circulation system.
The burner shall similarly have the following:-.
V) Red sign light on control board to indicate security and safety shut out.
– Air vent pipe.
– Any type of various other essential device.
E-2
The daily oil tank of power 1,800 litres in addition to measurement 1220x1220x1220mm pressed steel tank top shall be put 2.5 metres high above finished floor level on a steel stand, strongly secured on the ground and also the steel participants to be bolted. The oil container shall have an oil degree indicator, accessibility manhole, washout, overflow, inlet in addition to outlets connections and gateway valves.
The next strand of 50mm size involving both the storage tanks will be class ‘C’ black mild steel pipe, complete with a 50mm diameter filter. The burner gas supply pipe in the daily container will be a 25mm size class ‘C’ black mild steel.
The sticking to are also provided.
– FD fan.
– Temperature level indication gadgets.
– Pressure in addition to temperature degree assesses.
– Manhole cover total with a gasket.
Vi) Picture electrical protective mobile as fire failing tool.
The controllers shall be mounted on appropriate control panel to be mounted in a position easy to review and handle from the charging side of the incineration.
The control board will be produced from anodized, 16SWG, mild steel sheet.
The heater supply pipe will have 25mm thick fiber glass insulation and also perform with gauge 20SWG galvanised steel sheet.
The tenderer will give all the essential controls for appropriate security along with acceptable working of this installment. It’ll be powerful in building and construction and be produced in actors iron or other appropriate products full of placing plates. It needs to be quickly mountable and demountable for advantage of cleaning and upkeep. The heater shall have an appropriate supply of petroleum that will easily stir up in addition to burn in a safe way. Adequate supply will be provided to protect against any solid matter in the petroleum, or any type of problem that may split out from the petroleum out of harming any components or chocking of any sort of orifices or shutoffs. The free filtering system location should be sufficient to be certain the filter does not need dismantling for cleaning up more often than annually. The burner will have flame guidance by photo-electric mobile with concurrent arrangement controller for automated start up, running and shut-down of this burner.
The burner shall have all the vital controls e.g.Solenoid shutoffs, ignition controllers, image electrical cell gas security and safety controllers, low pressure gas distribution cut-off etc..
The heater will suit BS 799: part 3 and 6 1981 or any other pertinent British standard.The burner shall be as NU-WAY models or equivalent and also accepted.
1.1.2 CONTROLS
The incineration shall operate in an automated manner including all the essential controls. These controllers are to include security elements such as fire failing unit, pilot lights, integrates, novices, overload contactors, ON in addition to OFF switches for heaters along with followers, combustion room temperature signs for primary and also second chambers etc..
I) Electric ignition button ‘ON’ before the petroleum is provided.
– 25mm size high power strainer.
– Finishing of this container with at least 2No.
Ii) Delayed return to re-start setting to allow purging.
Iv) Favorable security and safety lock-out as an example of flame failing from whatever reason.
– Air ductwork complete with air dampers.
Iii) Re-start after temporary electrical supply failing.
– Oil degree signal.
– Dip stick.
– Drain pipeline.
– Primary in addition to secondary heaters and also fans.
The controls shall be mounted on appropriate control panel to be mounted in a position easy to review and manage from the charging door side of the incineration.
The control board will be produced from anodized, 16SWG, light steel sheet.