gym waste administration group at a tertiary care gym,1250 beeded hsopital.
our everyday waste created from all sources is 0.55 kg/bed/day =685kg/day
we want an incineration of all 150kg/hour filling capability.
plz answer with, purchasing, setup, running as well as upkeep cost.incinerations, especially, medical was burners
Department of Health has actually jumped a tender for Burner X 1 Device as well as the final day is on 16th June 2011. The spec of this Burner is listed below:
Requirements of Burner
1. Must have groundwork, Incineration, Scrubber steps to melt waste entirely and also waste gas have to be non-polluted
2. Strong steel, heat immune coating, stainless steel cap, painted tubular steel framework, 2-blowers, axial vane, appropriate drum (S/S, thick) for the burner ought to be supplied.
3. Approximate. 20 to 25 Kg per set and the time needed for 1 set more than 1 hour generally.
4. Ash should be just 5% of this waste substance
5. Weight of all Incinerator– 50-60 Kg
6. 220V Air Conditioning
7. Surgical, clinical & & laboratory waste
8. B X L X H = 4 ft X 8 feet X 6 ft
9. 1 year service guarantee
10. ISO Licensed
11. Mobile Burner
12. Electric