healthcare facility incinerator

* A switch circuit breaker for each engine (ventilators and also heaters).
23. The set up burner should endure a 1 year guarantee.
22.
* An additional injection of air to create certain excellent content.
25. The technical training of motorists will have to be offered and given by a professional from
* Electric box. The p – ashing has to be performed at the base of the combustion chamber or the deashing need to be Automatic or manual set de ashing.
22. The supplier has to give sets of extra components of first seriousness as well as consumable of their incineration.
* A regulatory authority with electronic viewing for the temperature degree of combustion.
This Item and also tools must include at the shed of the burner: foundation in rubble stone, seclusion roof versus humudity; elevation with brick of 20 cm (bloc cement), moving lintel (linteau) in improved concrete; steel framework (charpente en steel); roofing covering in sheet B.C.A. 28 BG (Toiture en t?le), steel rain gutter, sanitary installation (laundry pouch, soakway pit of 20 m of deepness); ash pit of 30 m3, electric setup; concrete piece for dealing with the burner; chanel for evacuation of rain water or waste water, cable net to get oygenation up the lintel; smooth rougtcasting of walls (interior in Addition to outside); plinth with cement; two metal doors; electronic mail paints inside and also latex paints out your home on walls and on walls; roof limit (planche de rive); measures for this spec Will Surely rely upon the dimension of the incineration which will identify the dimensions of the shed of the incineration., etc

* Burner with gas, mono-bloc casting helping kind with directly fire, lights and security and security of electronic ignition, permanent ventilation, electro-magnetic sluice gate of coverage and dividing shutoff.
* A timer with flexible temporization for the law of each heater.
21. Controls as well as policies:
* Electro-ventilator distributing the secondary air, the regulation of the air flow being accomplished by shutoffs and sticking to the control of the automated cycle.
The production center; it will contain medicinal and preventative maintenance, and utilizing machine, etc

NB.: Civil works and any kind of other associated services for the setup and training of operators need to get consisted of at the burner’s cost.
24. CE Production Conformity: BS EN 746-2-1997

21. The de- ashing has to be performed in the bottom of the combustion chamber or the deashing need to be Automatic or manual set de ashing.
22. Refine Filtering system: Scruber to be mentionned as optional
23. Emission Standards Conformity: BS 3316 or équivalent criterion
23. Capability to treat Plastic: Not much less than 40% by weight
24. CE Production Conformity: BS EN 746-2-1997
22. The provider has to give sets of extra parts of first seriousness as well as consumable of the incineration.
23. The set up burner should bear a one year assurance.
24. The distributor shall perforn an onsite installment of the burner.
25. The technical training of drivers will have to be offered and also given by a professional from
the manufacturing facility; it will contain medicinal and also preventative upkeep, and using machine, etc

NB.: Civil works and any kind of other related services for the setup and also training of operators need to be consisted of in the burner’s cost.
Specification for the shelter of the incineration: House of the incineration comprehensive in offer (your house have to have facilities for hand cleaning and also firefighting).
This product and also tools must include in the shed of the burner: foundation in rubble stone, seclusion roofing versus humudity; elevation with brick of 20 cm (bloc cement), proceeding lintel (linteau) in enhanced concrete; steel frame (charpente en steel); roof covering in sheet B.C.A. 28 BG (Toiture en t?le), steel rain gutter, sanitary installation (laundry basin, soakway pit of 20 m of deepness); ash pit of 30 m3, electric setup; concrete piece for dealing with the burner; chanel for evacuation of rain water or waste water, cord mesh for oygenation up the lintel; smooth rougtcasting of walls (interior as well as outside); plinth with cement; 2 metal doors; email paints inside and also latex paints outside your home on walls and on doors; roofing limit (planche de rive); steps for this spec will certainly depend upon the dimension of the incineration which will identify the size of the shed of the incineration., etc