Hospital incinerator

20.     Fan:
24.
The factory; it will consist of curative and preventative maintenance, and also the use of machine, respectively

NB.: Civil functions and any other related services for the setup and training of operators must be included in the incineration’s cost.
22. Process Filtering system: Scruber to be mentionned as discretionary
Control box watertight to dust, including:

* A change circuit breaker for each engine (ventilators and burners).
23.     The installed incineration must endure a 1 year guarantee.
22.     The provider must give batches of spare parts of original urgency and consumable of their incineration.

* Burner with fuel, mono-bloc casting directing kind with horizontal fire, lighting and safety of digital ignition, permanent ventilation, electromagnetic sluice gate of regulation and also isolating valve.
This material and equipment should include in the drop of the incineration: foundation in rubble stone, isolation roofing against humudity; elevation with brick of 20 cm (bloc cement), continuing lintel (linteau) in reinforced concrete; steel framework (charpente en alloy ); roofing in sheet B.C.A. 28 BG (Toiture en t?le),metal gutter, sanitary setup (wash basin, soakway pit of 20 m of thickness ); ash pit of 30 m3,electrical setup; concrete slab for repairing the incineration; chanel for m3 of rain water or waste water, wire mesh for aeration up the lintel; smooth rougtcasting of walls (interior and outside);plinth with cement; two metal doors;email paintings inside and latex paintings outside the house on walls and on walls; roofing limit (planche de rive); measures for this particular specification will depend on the magnitude of this incineration which will determine the size of this drop of this incineration., respectively

NB.: Civil works and any other related services for the installation and training of operators must be included in the incineration’s price.
Specification for the shelter of the incineration: House of the incineration inclusive in offer (the house must have facilities for hand washing and firefighting).
This material and equipment must include in the shed of the incineration: foundation in rubble stone, isolation roofing against humudity; elevation with brick of 20 cm (bloc cement), continuing lintel (linteau) in reinforced concrete; steel frame (charpente en metal); roofing in sheet B.C.A. 28 BG (Toiture en t?le),metal gutter, sanitary installation (wash basin, soakway pit of 20 m of depth); ash pit of 30 m3,electrical installation; concrete slab for fixing the incineration; chanel for evacuation of rain water or waste water, wire mesh for aeration up the lintel; smooth rougtcasting of walls (interior and outside);plinth with cement; 2 metal doors ;email paintings inside and latex paintings outside the house on walls and on doors; roofing limit (planche de rive); measures for this specification will depend on the size of the incineration which will determine the size of the shed of the incineration., etc