* A switch circuit breaker for each motor (ventilators and burners).
23. The set up incineration must endure a 1 year warranty.
The factory; it will include curative and preventive maintenance, and also the use of equipment, respectively
NB.: Civil functions and any other related services for the installation and training of operators must be included at the incineration’s price.
22. Process Filtering method: Scruber to be mentionned as optional
22. The provider must supply batches of spare parts of original urgency and consumable of the incineration.
* A secondary injection of air to guarantee perfect oxygen content.
24. The provider shall perforn an onsite installation of this incineration.
* Electric box. The p – ashing must be completed in the base of the combustion chamber or the deashing should be Automatic or manual batch p ashing.
This material and equipment should include at the shed of the incineration: base in rubble stone, isolation roofing contrary to humudity; elevation with brick of 20 cm (bloc cement), continuing lintel (linteau) in reinforced concrete; steel frame (charpente en alloy ); roof in sheet B.C.A. 28 BG (Toiture en t?le),metal gutter, sanitary installation (wash basin, soakway pit of 20 m of depth); ash pit of 30 m3,electric installation; concrete slab for repairing the incineration; chanel for m3 of rain water or waste water, cable mesh for aeration up the lintel; smooth rougtcasting of walls (inside and outside);plinth with cement; 2 metal doors;email paintings indoors and latex paintings outside the house on walls and on walls; roof limit (planche de rive); measures for this specification will depend on the size of this incineration which will determine the size of this shed of this incineration., respectively
* Burner with fuel, mono-bloc casting guiding type with horizontal flame, light and safety of electronic ignition, permanent ventilation, electromagnetic sluice gate of regulation and isolating valve.
* Electro-ventilator dispersing the secondary atmosphere, the regulation of the air leak has been carried out by valves and adhering to the constraint of the automated cycle.
21. The de- ashing must be done in the bottom of the combustion chamber or the deashing should be Automatic or manual batch de ashing.
22. Process Filtering system : Scruber to be mentionned as optional
23. Emission Standards Compliance: BS 3316 or équivalent standard
23. Capacity to treat Plastic: Not less than 40% by weight
24. CE Manufacturing Compliance: BS EN 746-2-1997
22. The supplier must give batches of spare parts of first urgency and consumable of the incineration.
23. The installed incineration must bear a one year guarantee.
24. The supplier shall perforn an onsite installation of the incineration.
25. The technical training of operators will have to be provided and given by a technician from
the factory; it will consist of curative and preventive maintenance, and the use of machine, etc
NB.: Civil works and any other related services for the installation and training of operators must be included in the incineration’s price.
Specification for the shelter of the incineration: House of the incineration inclusive in offer (the house must have facilities for hand washing and firefighting).
This material and equipment must include in the shed of the incineration: foundation in rubble stone, isolation roofing against humudity; elevation with brick of 20 cm (bloc cement), continuing lintel (linteau) in reinforced concrete; steel frame (charpente en metal); roofing in sheet B.C.A. 28 BG (Toiture en t?le),metal gutter, sanitary installation (wash basin, soakway pit of 20 m of depth); ash pit of 30 m3,electrical installation; concrete slab for fixing the incineration; chanel for evacuation of rain water or waste water, wire mesh for aeration up the lintel; smooth rougtcasting of walls (interior and outside);plinth with cement; 2 metal doors ;email paintings inside and latex paintings outside the house on walls and on doors; roofing limit (planche de rive); measures for this specification will depend on the size of the incineration which will determine the size of the shed of the incineration., etc