Combustion Efficiency 99.99percent
Retention time Of the stream gases not less than two Sec from the hot part.
Excess Oxygen concentration Of main combustion chamber 3-6% maximum.
Refractory The chambers should be lined with high thermal insulating refractory bricks with appropriate thickness and
with highly temp. resistance. Not less than 1400 C for the first combustion chamber, rather than less than 1600 C for the
secandry combustion chamber, and at the same time prevent the Temp. Of the exterior body of the chamber not higher than
70 C.
Doors Should be lined using the very same bricks, along with the edges lined with special suitable insulating material to prevent
any gas speeding, and the doors should be kept under negative pressure during the procedure. Not less than 99.9999 according to KEPA.
Wet System in case the machine equiped with a CEMS washing the stream gas with water, then it ought to be made from
appropriate anti corrossion materials, and equiped with pH meter to measure and also neutralize the water. It needs to have the ability to
utilize the water in closed recycled circuit several times before healing / discharging to the sewage system in accordance
using KEPARS.
Chimney It should be appropriate with all the ability and the technical specifications, together with height not less than 12m in
ground level. With simple opennable sampling stage equal about 3 inchand the best sampling places is 8D
downstream management and 2D upstream from any stream disturbancies.
Sampling point Should be equiped with a platform located down the sampling stage by a distance not less than 1 m, and
equiped with appropriate stairs from ground to the port with comfortable slope.
Ash Removal It should be auto ash removal system.
Fuel It should be double system, such as gas and natural gas.
Feeding System Must be auto feeding system to main chamber.
Control Room Should be equiped with a control panel shows Temp. Of the combustion burners, gas monitoring, electronic
Temp. Indecation for the primary/secondary chambers, electronic Temp. Indication for the gases…etc. it ought to be also
Auto performance, burnures on/off auto lamps change, auto start/stop for air emission control system, auto gas constant
tracking system reading and print out of gas emission parameters…etc..
Cooling System The primary chamber ought to be provided with auto cooling system systemthrough nozzles to permit direct cooling
if the Temp. Less than 500 C.
Flue cleaning and treatment To include a joint system (wet/dry), using lime, water, active carbon and carbon
filters.
Quenching system/Heat exchanger Should be made and made of anti corrosion and acid attack materials like
stainless steel 316 or equivalent.
Noise Level Not more than 85 dBA during regular operation.
Inaddition The desigh ought to guarantee that responsive fail-safe control systems are used.
The incineration ought to be installed inside closed appropriate building with good aeration and ventilation system.
The building contains facilities for off-loading of wastes from transportation vehicles. Auto cleansing system for trucks and
waste containers, and cool storage area…etc..
The quote should included list of initial spare parts for 7 decades.
The quote should include training, starting up and training of the operators and ministry of health
engineers inside/outside Kuwait.
Detailed drawings, catalogs should be included.Our regular activities generates 2-5 tons of assorted waste
materials daily which vary from condemned carcasses, and other wastes all of that need to be incinerated at above
800Centigrade measured flue exhaust gas.
The quotation should include supervising, starting up and training of the operators and ministry of health
engineers inside/outside Kuwait.
Detailed drawings, catalogs should be included.Our normal activities generates 2-5 tons of assorted waste
materials per day which range from condemned carcasses, and other wastes all which need to be incinerated at above
800Centigrade measured flue exhaust gas.