Product Description
Technology Respond(FAQ)
Q: What’s kind of waste may use within this equipment? A: This equipment for medical waste, pet animal, Municipal waste, reside waste. Prohibit any explosive and radiation material, liquid waste and gas waste. GB18484-2001.
Q: Treatment capacity A: Average Capacity calculated by medical waste(lower calorific power (L. C. P): 3.0TH Kcal/Kg per hour), not indicate any waste material. The animal/pet combustion speed around 2/3 of ordinary power.
Clover incineration use time per day up to 24 hours. Between each feed/combustion time, you will find approximately 0.5-1 hours heating time incineration furnace manufacturer, incineration hospital price, incineration in hospital, incineration manufacturer in shanghai, incineration producers in usa, and time for feeding waste. Actual combustion time daily is around 16 hours. The lifetime of incineration involving 5-10 year based on use.
Ordinarily, we proposal little laboratory, little clinic use capacity under 20 kgs per hour. When incineration use in hospital, then please calculate the waste output around 2kgs per people per day. If there are 200 sickbed at the clinic, that's mean you need 1 incineration capacity around 400kgs per day, switch to power per hour is approximately 30-40 kgs per hour. According the performance time each day, waste material, funding, growth, etc, you may use capacity from 30-50 kgs each hour incineration. *How to calculate Animal Cremation Burn Rate: 2/3 of this medical waste.
Q: Meeting and Testing A: We supply all documents and incinerations easy to setup and performance. Client can send people come to our factory to learn installation and operation. Generally, We do not send engineer to local website if not ask. The dispatch price is extra based on order. The second combustion chamber: 1000-1200 centi degree.
Q: Incinerator Control Mode A: Default Control mode is common control case. PLC mode based on order and model.
Q: Operation and maintenance costs A: Operation price based on fuel consumption rate and power/staff, etc.
Annual approximately $500-$1000USD annually maintenance according version, use situation.
One person can service 02 device incinerations. The staff must have fundamental electrician comprehension to operate/inspect/maintaince incineration/burner/blower according to performance consumer guider, and know risk of medical waste to protect worker self with mandatory security element.
Q: The Residency period in combustion chamber A: 02 sec.
Q: The Residency time in secondary combustion chamber
A: 02 sec.
Items/Model | TS10(PLC) | TS20(PLC) | TS30(PLC) | TS50(PLC) | TS100(PLC) |
Burn Rate | 10 kg/hour | 20 kg/hour | 30 kg/hour | 50 kg/hour | 100 kg/hour |
Feed Capacity | 20kg | 40kg | 60kg | 100kg | 200 kg |
Control Mode | PLC | PLC | PLC | PLC | PLC |
Combustion Chamber | 100L | 210L | 330L | 560L | 1200L |
Internal Dimensions | 50x50x40cm | 65x65x50cm | 75x75x60cm | 100x80x70cm | 120x100x100cm |
Secondary Chamber | 50L | 110L | 180L | 280L | 600L |
Smoke Filter Chamber | Yes | Yes | Yes | Yes | Yes |
Feed Mode | Manual | Manual | Manual | Manual | Manual |
Voltage | 220V | 220V | 220V | 220V | 220V |
Power | 0.5Kw | 0.5Kw | 0.5Kw | 0.7Kw | 0.7Kw |
Oil Consumption (kg/hour) | 5.4–12.6 | 7.8–16.3 | 10.2–20 | 12.1–24 | 14–28 |
Gas Consumption (m3/hour) | 6.2–11.4 | 8–15.7 | 9.8–20 | 9.9–26.1 | 10–32.2 |
Temperature Monitor | Yes | Yes | Yes | Yes | Yes |
Temperature Protection | Yes | Yes | Yes | Yes | Yes |
Oil Tank | 100L | 100L | 100L | 100L | 200L |
Feed Door | 30x30cm | 45x40cm | 55x50cm | 70x55cm | 80x60cm |
Chimney | 3Meter | 3Meter | 5Meter | 5Meter | 10Meter |
Chimney Type | Stainless Steel | Stainless Steel | Stainless Steel | Stainless Steel | Stainless Steel |
Residency Time | 2.0 Sec. | 2.0 Sec. | 2.0 Sec. | 2.0 Sec. | 2.0 Sec. |
Gross Weight | 1500kg | 2200kg | 3000kg | 4500kg | 6000kg |
External Dimensions | 140x90x120cm | 160x110x130cm | 175x120x140cm | 230x130x155cm | 260x150x180cm |