Incinerator Calculations for Bunker Capacity

Basic Info.

Model NO.:hospital diesel fuel fired incinerations
Export Markets:Global

Product Description

Technology Respond(FAQ) 

Q: What is kind of waste may utilize in this equipment?  A: This equipment to medical waste, pet animal, Municipal waste, reside waste. Prohibit any explosive and radiation material, liquid gas and waste waste. 

Q: Incinerator Smoke Standard  A: China Government Standard: No. GB18484-2001. 

Q: Treatment capacity  A: Average Ability calculated by medical waste(lower calorific power (L. C. P): 3.0TH Kcal/Kg per hour)doesn’t indicate any waste material. The animal/pet combustion rate around 2/3 of average power. 

Clover incineration utilize time per day up to 24 hours. Between every feed/combustion time, you will find approximately 0.5-1 hours cooling time plus time for feeding squander. Actual combustion time daily is around 16 hours. The lifetime of incineration involving 5-10 year according to utilize. 

Ordinarily, we proposition small lab, small clinic use capacity under 20 kgs per hour. When incineration utilize in hospital, please compute the waste output around 2kgs per individuals every day. Medical waste furnace, animal waste incineration manufacturer, national incineration, incineration installation demonstration, medical incineration prices, If there are 200 sickbed in the hospital, that's mean you need 1 incineration capacity around 400kgs every day, change into power each hour is approximately 30-40 kgs per hour. According the operation period every day, waste material, budget, growth, etc, you may use capacity from 30-50 kgs each hour incineration.  *How to compute Animal Cremation Burn Rate: 2/3 of this medical waste. 

Q: Meeting and Testing  A: We provide all files and incinerations easy to installation and operation. Client can send individuals come to our factory to learn operation and installation. Generally, We do not send engineer to neighborhood website if not ask. The dispatch cost is additional according to order.  The second combustion chamber: 1000-1200 centi degree.  PLC mode according to model and order. 

One individual can service 02 device incinerations. The staff should have basic electrician knowledge to operate/inspect/maintaince incineration/burner/blower according to operation user guider, and know threat of medical waste to safeguard worker self with essential protection component. 

Q: The Residency period in secondary combustion chamber  A: 02 sec.

Annual around $500-$1000USD per year maintenance according model, use situation. 

One person can service 02 unit incinerations. The staff should have basic electrician knowledge to operate/inspect/maintaince incineration/burner/blower according to operation user guider, and know risk of medical waste to protect worker self with necessary protection element. 

Q: The Residency time in secondary combustion chamber 
A: 02 sec.

Items Specification
Burn Rate 10 kg/hour 20 kg/hour 30 kg/hour 50 kg/hour 100 kg/hour
Model TS10(PLC) / TS20(PLC) / TS30(PLC) / TS50(PLC) / TS100(PLC)
Main Product List Double Combustion Chamber
Smoke Filter Chamber
PLC Mode Control Case
Stainless Steel Chimney
Italy oil/gas burner: 02 units
Oil Tank (if oil fuel)

Categories:

Recent Posts