Basic Info.
Product Description
Technology Respond(FAQ)
Q: What’s kind of waste can utilize within this gear? A: This gear to medical waste, pet animal, Municipal waste, reside waste. Prohibit any explosive and radiation substance, liquid waste and gas waste. GB18484-2001.
Q: Treatment capacity A: Typical Capacity calculated by medical waste(lower calorific power (L. C. P): 3.0TH Kcal/Kg per hour)doesn’t indicate any waste material. The animal/pet combustion rate around 2/3 of average capacity.
Clover incineration utilize time per day up to 24 hours. Between every feed/combustion time, you will find about 0.5-1 hours cooling time and time to get feeding squander. Medical waste, medical waste incineration china, pet incineration gear, pet incineration for sale, mobile incineration makers, waste incineration producers from china, Actual combustion time daily is around 16 hours. The lifetime of incineration between 5-10 year based on utilize.
Ordinarily, we proposal little lab, little clinic use capability under 20 kgs per hour. When incineration utilize in hospital, please calculate the waste output capacity around 2kgs per individuals every day. If there are 200 sickbed at the clinic, that's mean you need 1 incineration capability around 400kgs every day, switch to capacity per hour is around 30-40 kgs per hour. According the operation time every day, waste material, budget, development, etc, you can use capacity from 30-50 kgs each hour incineration. *The best way to calculate Animal Cremation Burn Rate: 2/3 of the medical waste.
Q: Assembly and Testing A: We supply all files and incinerations simple to setup and operation. Client can send individuals visit our factory to find out installation and operation. Generally, We do not send engineer to local website or even ask. The dispatch price is additional based on order.
Q: Combustion Temperature A: The first combustion chamber: 800-1000 centi degree. The second combustion chamber: 1000-1200 centi degree. PLC mode based on model and order.
Q: Operation and maintenance costs A: Operation price based on fuel consumption rate and power/staff, etc.
Annual around $500-$1000USD per year maintenance according version, utilize situation.
One person can service 02 unit incinerations. The staff should have fundamental electrician comprehension to operate/inspect/maintaince incineration/burner/blower according to operation user guider, and know threat of medical waste to safeguard worker self with necessary security element.
Q: The Residency time in secondary combustion chamber A: 02 sec.
Q: The Residency time in secondary combustion chamber
A: 02 sec.
Items/Model | TS10(PLC) | TS20(PLC) | TS30(PLC) | TS50(PLC) | TS100(PLC) |
Burn Rate | 10 kg/hour | 20 kg/hour | 30 kg/hour | 50 kg/hour | 100 kg/hour |
Feed Capacity | 20kg | 40kg | 60kg | 100kg | 200 kg |
Control Mode | PLC | PLC | PLC | PLC | PLC |
Combustion Chamber | 100L | 210L | 330L | 560L | 1200L |
Internal Dimensions | 50x50x40cm | 65x65x50cm | 75x75x60cm | 100x80x70cm | 120x100x100cm |
Secondary Chamber | 50L | 110L | 180L | 280L | 600L |
Smoke Filter Chamber | Yes | Yes | Yes | Yes | Yes |
Feed Mode | Manual | Manual | Manual | Manual | Manual |
Voltage | 220V | 220V | 220V | 220V | 220V |
Power | 0.5Kw | 0.5Kw | 0.5Kw | 0.7Kw | 0.7Kw |
Oil Consumption (kg/hour) | 5.4–12.6 | 7.8–16.3 | 10.2–20 | 12.1–24 | 14–28 |
Gas Consumption (m3/hour) | 6.2–11.4 | 8–15.7 | 9.8–20 | 9.9–26.1 | 10–32.2 |
Temperature Monitor | Yes | Yes | Yes | Yes | Yes |
Temperature Protection | Yes | Yes | Yes | Yes | Yes |
Oil Tank | 100L | 100L | 100L | 100L | 200L |
Feed Door | 30x30cm | 45x40cm | 55x50cm | 70x55cm | 80x60cm |
Chimney | 3Meter | 3Meter | 5Meter | 5Meter | 10Meter |
Chimney Type | Stainless Steel | Stainless Steel | Stainless Steel | Stainless Steel | Stainless Steel |
Residency Time | 2.0 Sec. | 2.0 Sec. | 2.0 Sec. | 2.0 Sec. | 2.0 Sec. |
Gross Weight | 1500kg | 2200kg | 3000kg | 4500kg | 6000kg |
External Dimensions | 140x90x120cm | 160x110x130cm | 175x120x140cm | 230x130x155cm | 260x150x180cm |