demands for prepurge and time between restarts should be verified. The evaluation should include but not limited to the
following;
? Flame safeguard. Operation of the audible alert (where applicable) and visible indicator ought to be verified. The shutdown
occasions ought to be verified.
? Testing of all shutdowns into the machine.
? Interlocks. All of interlocks provided should be tested for proper operation as specified by the unit
manufacturer.
? Combustion controls. The combustion controls ought to be steady and operate easily.
? Programming controls. Programming controls should be confirmed since
controlling and cycling the unit in the planned manner. A stopwatch ought to be used for verifying periods of time.
? Fuel supply controls. The satisfactory operation of the fuel control solenoid valves for all requirements of
operation and shutdown ought to be verified.
? Low voltage evaluation. A low voltage evaluation ought to be run on the incineration unit to satisfactorily demonstrate
that the fuel supply to the burners will be automatically shut off prior to the incineration malfunction results in the
reduced voltage.
? Switches. All switches should be tested to verify proper operation. Emission tests. The exhaust of the
incineration will be tested to abide by local emission limits given in annex 1. Be aware that this evaluation has to become
seen by an independent body okay from the CEB. The evaluation will include measurement of parameters provided in annex
that the fuel supply to the burners will be automatically shut off before an incineration malfunction results from the
reduced voltage.
? Switches. All switches should be tested to verify proper operation. Emission tests. The exhaust of the
incineration shall be tested to comply with local emission limits given in annex 1. Note that this test has to be
witnessed by an independent body acceptable by the CEB. The test shall include measurement of parameters given in annex