demands for prepurge and time between restarts should be verified. The evaluation should include but not limited to the

following;

?     Flame safeguard. Operation of  the audible alert (where applicable) and visible indicator ought to be verified. The shutdown

occasions ought to be verified.

?     Testing of all shutdowns into the machine.

?     Interlocks. All of interlocks provided should be tested for proper operation as specified by the unit

manufacturer.

?     Combustion controls. The combustion controls ought to be steady and operate easily.

?     Programming       controls.       Programming       controls should   be   confirmed since

 

controlling and cycling the unit in the planned manner. A stopwatch ought to be used for verifying periods of time.

?     Fuel supply controls. The satisfactory operation of the fuel control solenoid valves for all requirements of

operation and shutdown ought to be verified.

?     Low voltage evaluation. A low voltage evaluation ought to be run on the incineration unit to satisfactorily demonstrate

that the fuel supply to the burners will be automatically shut off prior to the incineration malfunction results in the

reduced voltage.

?     Switches. All switches should be tested to verify proper operation. Emission tests. The exhaust of the

incineration will be tested to abide by local emission limits given in annex 1. Be aware that this evaluation has to become

seen by an independent body okay from the CEB. The evaluation will include measurement of parameters provided in annex

that the fuel supply to the burners will be automatically shut off before an incineration malfunction results from the

reduced voltage.

?     Switches. All switches should be tested to verify proper operation. Emission tests. The exhaust of the

incineration shall be tested to comply with local emission limits given in annex 1. Note that this test has to be

witnessed by an independent body acceptable by the CEB. The test shall include measurement of parameters given in annex