Infectious waste pyrolysis system chinalarge creature incinerators

Major Elements are — Ethanol, Paraffin, Silicon, Aluminium chloro hydrate, Bentone,LPG

quote to Get incinerations for industrial chemical wastes Therapy,

1 burning rate Has to Be Average 30kgs/h

Our demands are  for 125 kg/hr and 42 kg/hr, please send quote with catalogue for both options
2 inside of chamber material Has to Be refractory concrete cement
5 incineration 15 kg the specifications High temperature incineration​99% combustion efficiency Temperature up to 1200°C or

Smoke and odor free Outstanding heat retention Electric powered​ Quick heatup days Temperature Up to 1200°C or as required

Ability 15 Kg Burning Efficiency 98 percent Noise- <78db Power – Electric Chamber​Single>

vent Monitoring device​ Air Pollution Control Device​ CE and ISO Accredited

I ‘d like to inquire about a power plant by burning waste. We have lots of camps for displaced people in Syria, and we

want to buy a plant to create power by municipal waste incineration please send an offer or some details.

4 voltage Has to Be 220V

vent Monitoring device​ Air Pollution Control Device​ CE and ISO Accredited

I ‘d like to inquire about a power plant by burning waste. We have lots of camps for displaced people in Syria, and we

want to buy a plant to create power by municipal waste incineration please send an offer or some details.

5 inside temperature first must be 1000c  and next should be 1200c

3 it functions in 3 system diesel petroleum / Natural gas or LPG
We’re currently dealing in Defense Related Equipment, Construction Assistance and Medical Equipment, Modular Solutions

for Hospitals, Waste Management System, CSSD, Hospital Furniture and Solutions. We’re located in the Capital city of

Pakistan i.e. Islamabad,where you will find all the head offices of Army and Govt. institutions. We have the capacity to

Participate in tenders and we also have a strong network of energetic/active traders and sales staff in Pakistan and

Categories:

Recent Posts