large animal incinerators

The incineration will also be equipped with special loading apparatus and mechanisms that enable safe incineration of

solid waste concurrently with liquid sludge. Loading of solid waste may be accomplished via bags. Bidder shall

suggest connection points for sludge, DO and Hot water. Pipings up to those connection points will be on the cost of

that the CEB. All equipment, like pumps, blower fans, compressors and etc forming part of the incineration lot will take

their electrical supply from an electrical panel. The panel should  be  equipped  with  proper circuit  breakers

and  contactors  for  each component and will allow independent padlocking of their equipment by operators without

intervening from interior the panel. All padlocking works will be reached from outside the electrical panel. The

Electric panel will take supply from an external 3 phase supply.

 

–      the primary compartment shall be fed from an existing switchboard

 

 

The panel will be of factory constructed, metal clad and draw-out type in design for outside application.

2.4  Electrical Panel

 

The panel nominal voltage shall be 415 Vac and its rated insulation voltage shall be 1000 Vac.

 

–      The main compartment shall be fed from an existing switchboard

 

 

The panel shall be of factory assembled, metal clad and draw-out type in design for outdoor application.