large scale incinerator

planned manner. Appropriate prepurge, ignition, postpurge, and modulation ought to be verified. A stopwatch ought to be utilized

for verifying intervals of time.

?     Fuel supply controls. The satisfactory operation of the fuel control solenoid valves for all requirements of

operation and shutdown ought to be verified.

?     Low voltage evaluation. A low voltage evaluation ought to be run on the incineration unit to satisfactorily demonstrate

that the gas supply to the burners will be automatically shut off prior to an incineration malfunction results in the

reduced voltage.

?     Switches. All switches should be tested to verify proper operation.

 

high-capacity, strong, European Standard incineration,ideal for high volume incineration,together with integral after-burner

for greater efficiency and emissions management. The incineration will burn up to 50kg of

waste per hour (up to 150kg burn off

Structure

Mild steel welded fabrication composed of sheet steel

and structural department supports.

Lining

Monolithic high grade refractory concrete using high grade insulation financing.

Burners

Fully automatic, high-efficiency burners with electronic ignition, flame recognition and combustion control apparatus

fitted.

Loading — Ash elimination

Manual ash removal in the primary chamber. (Ash doors are available on request).

Exterior complete

Multi-coat high quality, high-temperature aluminium enamel top coat paint, finished in silver.

Control

Manual ash removal from the primary chamber. (Ash doors are available on request).

Exterior finish

Multi-coat high quality, high-temperature aluminium enamel top coat paint, finished in silver.

Control