planned manner. Appropriate prepurge, ignition, postpurge, and modulation ought to be verified. A stopwatch ought to be utilized
for verifying intervals of time.
? Fuel supply controls. The satisfactory operation of the fuel control solenoid valves for all requirements of
operation and shutdown ought to be verified.
? Low voltage evaluation. A low voltage evaluation ought to be run on the incineration unit to satisfactorily demonstrate
that the gas supply to the burners will be automatically shut off prior to an incineration malfunction results in the
reduced voltage.
? Switches. All switches should be tested to verify proper operation.
high-capacity, strong, European Standard incineration,ideal for high volume incineration,together with integral after-burner
for greater efficiency and emissions management. The incineration will burn up to 50kg of
waste per hour (up to 150kg burn off
Structure
Mild steel welded fabrication composed of sheet steel
and structural department supports.
Lining
Monolithic high grade refractory concrete using high grade insulation financing.
Burners
Fully automatic, high-efficiency burners with electronic ignition, flame recognition and combustion control apparatus
fitted.
Loading — Ash elimination
Manual ash removal in the primary chamber. (Ash doors are available on request).
Exterior complete
Multi-coat high quality, high-temperature aluminium enamel top coat paint, finished in silver.
Control
Manual ash removal from the primary chamber. (Ash doors are available on request).
Exterior finish
Multi-coat high quality, high-temperature aluminium enamel top coat paint, finished in silver.
Control