The successful Bidder shall notify CEB in writing at least three (3) weeks prior to the carrying out of mill tests

in order to enable sending of a CEB Engineer for witnessing  of  the  mill tests.    A’Factory  Acceptance  Test

‘  schedule  will likely be

 

mutually agreed between the successful Bidder and the CEB Engineer.

NOTE: All charges inclusive of air tickets, meals & hotel accommodation, local transportation and other living expenses

for your CEB Engineer shall be borne by the successful Bidder.

The successful Bidder shall submit to the CEB Engineer the following documents Before shipment of the incineration

Collection. Certification of Conformity inclusive of the clause’We certify that, subject to concessions or exceptions

listed here after, the provides detailed above were fabricated in accordance with the technical specifications of their

contract, order and therefore, all tests and inspections having been finished, the provides comply in every aspect using the

applicable particular specifications, drawings, and applicable standards and regulations in force’.

?     Factory Acceptance Test(FAT) Certificates

?     Bill of Material (BOM)

?     Three(3) Complete Sets of As-Built Drawings

?     Installation and commissioning process of the incineration set.

?     Program of functions for carrying the setup and commissioning

?     Labour  and  logistic  requirement  for  carrying  the  installation  and commissioning.

?     All electric drawings and wiring diagrams

Form of Waste: To take care of medical waste, categories A, B, C, D,E

Sort of incineration: Pyrolytic

Nominal Burn Speed: 50 to 60 Kg/hrat  3500Kcal/Kg

Loading: Manual, Batch Load

De ashing: Automatic or manual batch de ashing

The incineration must avoid the release of black smoke and

fine dust, during the loadings

Primary Chamber Capacity: 2 -3 m3

The insulation of the combustion chamber should be composed of

refractory bricks, having a high content of aluminium and insulates,

The plate of combustion in carborundum avoiding the mending of

glass and slags

Hours of operation/day: 10 hrs

Max operating Temperature: 14000C

Normal Operating Temperature (Main ): 8500C

Operating Temperature (Secondary): 11000C

It should have temperature regulators in digital watch:

Carbon Content of Ash: <2%

The setup should be completely free from visible smoke as well

as offensive odours.

Residence Time in Second Chamber: two seconds minimum

The Inner diameter of the Chimney: Ø 400

Height of Stack:  8 m

Burner performance: Automatic On/Off

Fuel: Diesel

Fuel Consumption at rated capacity: 7 Kg waste/ltr

Electricity Consumption: <2kW at rated capacity

Operating Voltage: 220-240VAC 50 Hz

Spare Parts: Provide for 1 year lent as alternative

Consumables: Provide for a single year of performance to be mentioned

as alternative

Guarantee: Parts and service support: 1 year minimum article

commissioning

Service Support: Swing 72 hours.

Emission Standards Compliance: BS 3316 or équivalent standard

Process Filtering method: Scruber to be mentionned as alternative

CE Manufacturing Compliance: BS EN 746-2-1997

Design Specification: Types A, B, C, D, and E of Health waste

Installation and Commissioning: Included in conditions of supply

Coaching in preventative and therapeutic maintainance and use

of their incineration: Operator training inclusive in provide

Capability to cure Plastic: Not less than 40 percent by weight

Decrease of their incineration

Shelter of the incineration inclusive in offer (the protector must possess

facilities for hand washing and firefighting).

This material and equipment must include in the shed of the

incineration:

*   Foundation in rubble stone,

*   Isolation roof against humidity;

* Elevation with brick of 20 cm (bloc cement), ongoing lintel

(linteau) in reinforced concrete;

*  Steel frame (charpente en steel );

* roof in sheet B.C.A. 28 BG (Toiture en tôle),metal gutter,

*  Sanitary installation (wash basin, soak way pit of 20 m of depth);

*  Ash pit of 30 m3,

* Electrical setup;

* Concreteslab for mending the incineration;

* Chanel for evacuation of rain water or waste water

*  Wiremesh for aeration up the lintel;

* smoothrougtcasting of walls (interior and outdoors );

* plinth with cement;

*  two metal doors;

*  Enemail paintings indoors and latex paintings outside the shield

on walls and on walls;

*  roof limit (planche de rive);

*  Measures with this specification will be contingent on the size of the

incineration which will decide on the size of the shed of the incineration.

*  Roofing limit (planche de rive);

*  Measures for this specification will depend on the size of the

incineration which will determine the size of the shed of the incineration.