Medical incinerator manufacturer

1. The dual room incineration shall preferably be designed. Air distribution from the primary and secondary chamber shall be controlled between 30%-80% and 170%-120% of stoichiometric sum respectively. The combustion air shall be provided through a separate forced draft fan bookkeeping for your air provided through burners. Provision shall be made in the principal chamber to measure the water column pressure.
(c) Low degree beginning of transfer pump
(d) High level stop of transfer pump

10. A ready built fabricated space shall be provided for housing the incineration. The space is going to be made in such a way that free space is  available  on either side and heat radiation  kept at minimal and giving the operators an easy achievable environment and ventilation. The materials will be adequate structural thickness of mild steel angles neatly coated with metal primer and epoxy paint to withstand sea corrosion
– Can it allow to deal with waste or drug containing glass (whatever color: transparent or coloured white) without causing explosions?
3. Medical incineration manufacturer The refractory lining of the room shall be strong enough to maintain minimal temperature of 1000dc from the principal room and 1200 dc from the secondary room. The refractory& insulation bricks will have minimal 115mm thickness each & conform to IS:8-1983 & IS:2042-1972 respectively.
– Is there  microbiological testing particularly: the processing efficiency bascillus

(a) Low level alarm
4. The incineration casing will be produced of SS/MS plate of adequate thickness (minimum 5mm) and painted externally with heat resistant aluminium paint right to defy temp.of 250 dc with appropriate surface preparation. Refractory liner of this hot duct will probably be achieved with refractory castable (minimal 45mm thick)& insulation castable(minimal 80mm thick). Ceramic wool will be utilized at sexy duct flanges & expansion joints.
(b) High level alert
– effectiveness for the treatment of placenta?
6. Incinerator will have computer or graphic recording device which shall automatically and continuously monitor and record dates, time of day, batch sequential number,Co,Co2,O2 in gaseous emission will also be  measured every day.
5. There will be a separate burner each to your main & secondary room. The heat input capacity of each burner will be sufficient to raise the temp.in the main & secondary chambers as 800+/50dc and 1050+/-50dc respectively in maximum of 60 minutes before waste charging. The burners will have automatic shifting off/on control to prevent the changes of temperatures outside the essential temp.range.

(a) Low level alarm
(b) High level alarm
(c) Low level start of transfer pump
(d) High level stop of transfer pump

10.A ready built fabricated room shall be supplied for housing the incineration. The room will be designed in such a way that free space is  available  on all sides and heat radiation  kept at minimum and giving the operators an easy workable environment and ventilation. The materials will be sufficient structural thickness of mild steel angles neatly coated with metal primer and epoxy paint to withstand sea corrosion
– effectiveness for the treatment of placenta? and expired or spoiled drugs, cytotoxic and cytostatic drugs prescribed: narcotics eg
– Does it allow to treat drug or waste containing glass (whatever color: transparent or colored white) without causing explosions?
– The ability of the liquid waste treatment (blood, urine stained, other body fluids contaminated, regardless what volume packaging?
– The efficiency of process chemicals (after neutralization and detoxification: solids and liquids)
– Is there  microbiological testing especially: the processing efficiency bascillus