Requires of Heater
1. Need to possess prep work, Incineration, Scrubber actions to thaw waste totally in addition to likewise waste gas need to be non-polluted
2. Ash must be only 5% of this waste material
5.
our daily waste generated from all sources is 0.55 kg/bed/day =685kg/day
we require a burner of 150kg/hour filling up skill. The specification of this Heater is as listed below:
Prerequisites of Burner
1. Should have preparation, Incineration, Scrubber actions to thaw waste completely and also waste gas require to be non-polluted
2.
9. 1 year service guarantee
10. ISO Licensed
11. Mobile Burner
12. Electric
(adsbygoogle = window.adsbygoogle || []).push({});{
(adsbygoogle = window.adsbygoogle || []).push({});|}
university hospital waste administration group at a tertiary care gym,1250 beeded hsopital.
our regular waste developed from all sources is 0.55 kg/bed/day =685kg/day
we require an incineration of 150kg/hour filling up capacity.