Medical waste incineration system of 300 kg/hr shed price with dual fuel (gas in Addition to diesel) type, daily 8-16 hrs procedure and a Heap elevation of 15 meter.Primary Burning off
Second combustion
19. A control box making certain the full cycle of burning. Fan:.
. Nature: 42% of Al203.
15. Fuel: diesel.
.
7. It needs to be able to reduce the quantity of wastes by 98%.
* A timer with flexible temporization for the law of every burner.
* Completely limited door to the hand-operated loading of waste. The loading should be Guidebook, Batch Tons.
* Burner with fuel, mono-bloc dispersing leading type with directly flame, illumination and safety and security of digital ignition, irreversible ventilation, electro-magnetic sluice gateway of regulation and dividing shutoff.
. Thickness: ≥ 75 mm.
i. The primary combustion chamber will be accepted since the Essential burning zone;
25. The technological training of operators might have to be provided as well as provided by a specialist.
2. It must Be Able to operate less than 10 hours/day
* Composition of the refractory;.
– Nature: Calcium silicate.
21. Controls and guidelines:.
* Make-up of this refractory;.
11. The Interior diameter of this Smokeshaft: Ø 400 and its elevation: 8 m.
12. The loudness of the combustion room: 1.200 L.
* Electro-ventilator dispersing the secondary atmosphere, the guideline of the air flow has been carried out by valves and also adhering to the control of the automated cycle.
23. Capability to cope with Plastic: Not much less than 40% by weight.
Nature: 65% of Al203.
3. This burner has to be able to ruin all combustible wastes produced by healthcare centers, private practices, research labs, institutes, and so on.
– Shield in coarse panels:
13. The Measurement of this door for loading in cm: 70×× 70.
Nature: Calcium.
Control box watertight to dirt, consisting of:
* A switch breaker for each and every engine (ventilators as well as burners).
8. It needs to be able to hold emission in the 2nd melt gas house of less than 2 seconds.
9. The incineration should be wholly devoid of noticeable smoke in addition to offensive odours.
* Frontage of packing with door seals ended on hinges, wheel of screw plug, versatile joint, and packing protecting out of refractory.
* The insulation of the combustion chamber have to be made up of refractory blocks, having a high web content of aluminium and insulates bricks in order to assure a minimum temperature on the outside sheet steel.
* A regulatory authority with watch to your temperature degree of postcombustion.
* Plate of combustion in Carborundum, avoiding the repairing of glass and slags. A chamber of post combustion of gases.
Both the primary and the additional temperature amounts shall be preserved till All of the waste has actually been completely combusted;
Smokeshaft
* A apparatus of shot of atmosphere enabling a complete recombustion of gases,.
The smokeshaft shall have a minimum elevation of 4 meters over ground degree;
22. The provider should supply sets of spare elements of very first urgency and consumable of the incineration.
In the factory; it’ll consist of alleviative and preventative upkeep, as well as using device, etc
* A button breaker for every engine (ventilators as well as burners).
* A timer with flexible temporization for the law of each burner.
* A regulator with digital watching for the temperature of combustion.
* A regulatory authority with watch for the temperature level of postcombustion.
* Electric box.
21. The de- ashing must be performed in all-time low of the burning chamber or the deashing ought to be Automatic or hands-on batch de ashing.
22. Refine Filtering system: Scruber to be mentionned as optional.
23. Exhaust Requirements Conformity: BS 3316 or équivalent requirement.
23. Capability to deal with Plastic: Not much less than 40% by weight.
24. CE Manufacturing Compliance: BS EN 746-2-1997.
22. The provider should provide sets of spare parts of very first urgency and consumable of the incineration.
23. The set up incineration should birth a one year guarantee.
24. The provider will perforn an onsite setup of the burner.
25. The technological training of operators will have to be provided as well as provided by a professional.
from the factory; it will consist of alleviative and preventative upkeep, as well as using device, etc