Medical waste incineration system of 300 kg/hr burn with dual fuel (Gasoline and diesel) Form, daily 8-16 hrs operation and a Pile height of 15 meter.Primary combustion

* A change circuit breaker for each engine (ventilators and burners).
This incineration with”PYROLYTIC” combustion must have:
19.     A controller box ensuring that the whole cycle of combustion. Fan:
* Perfectly tight door to your manual loading of waste. The loading should be Manual, Batch Load
* A secondary injection of air to ensure perfect oxygen content.
ii.     The minimum combustion temperature of the primary chamber will not be less than 800 degrees C;

Secondary combustion
.
7.     It needs to have the ability to reduce the quantity of wastes by 98%.
The minimum exit velocity of the emissions will not be less than 10 metres/second;1.    
10.     The lower volt electricity (L.C.P) of this waste will be 3,500 kcal/kg
* A burner of light that the use is restricted to the ignition of waste.
* A device of air inlet of cooling of waste gases,
24.
The gas temperature as measured against the inside wall at the secondary chamber, not in the flame zone, will not be as suggested in Lots 1-7;
* A sheath of all those gases burnt.
* Burner with fuel, mono-bloc casting guiding type with flat flame, lighting and safety of     electronic ignition, permanent venting, acoustic sluice gate of regulation and isolating valve.
* A regulator using electronic watching for the warmth of postcombustion.
8.     It needs to be able to hold emission at the next burn with gasoline residence of not less than 2 seconds.
21.    
.
24.     The provider will perforn an onsite installation of this incineration.
The p – ashing must be completed in the base of the combustion chamber or the deashing should be Automatic or manual batch p ashing.
Both the main and the secondary temperatures will be maintained until All of the waste was completely combusted;

Chimney
•    Insulate in panels that are fibrous:
* A regulator using electronic watching for the warmth of combustion.
Nature: 65 percent of Al203
9.     The incineration should be wholly free from visible smoke as well as offensive odours.
15.     Fuel: diesel
22. Process Filtering method: Scruber to be mentionned as discretionary
From the factory; it will consist of curative and preventive maintenance, and the use of equipment, etc

18.     A chamber of post combustion of gases
* Frontage of loading door seals gone up on hinges, wheel of screw plug, flexible joint, and stuffing insulating out of refractory.
25.     The specialized training of operators Will Need to be provided and awarded by a technician
13.     The Dimension of the door for loading in cm: 70×70.
Nature: Calcium
. Nature: 42% of Al203
14.     Burner operation ought to be Automatic On/Off
The residence time at the secondary chamber shall not be less than 2 seconds;
23.     The installed incineration must endure a 1 year guarantee.
2.     It Needs to Be able to operate not less than 10 hours/day
* Carcass in strong sheet steel with assistance of connection.
* A burner of combustion of gases,
* A device of injection of air allowing a total recombustion of gases,
3.     This incineration must have the ability to destruct all combustible wastes produced by hospitals, private practices, laboratories, institutes, etc…
11.     The Internal diameter of the Chimney: Ø 400 and its elevation: 8 m
23. Ability to deal with Plastic: Not less than 40% by weight
•    The Temperatures of combustionMinimum will be 850oC and maximum 1400oC
16.     The provider must provide  necessary advice for the best of  the installation

21. The de- ashing must be done in the bottom of the combustion chamber or the deashing should be Automatic or manual batch de ashing.
22. Process Filtering system: Scruber to be mentionned as optional
23. Emission Standards Compliance: BS 3316 or équivalent standard
23. Capacity to treat Plastic: Not less than 40% by weight
24. CE Manufacturing Compliance: BS EN 746-2-1997
22.    The supplier must give batches of spare parts of first urgency and consumable of the incineration.
23.    The installed incineration must bear a one year guarantee.
24.    The supplier shall perforn an onsite installation of the incineration.
25.    The technical training of operators will have to be provided and given by a technician
from the factory; it will consist of curative and preventive maintenance, and the use of machine, etc