Petrol oil fired medical waste incenerator

incineration.

Heat Waste Incinerator Design D. MEGABYTES 750XL Melt Rate-150Kg/ hr minimal Weight( Kg) -4000 kg Added Chamber

(dual chamber with post-burning) Gas Retention Time 2 2nd Gas Diesel Power Supply for control box 220V-240, single

phase 50-60Hz Minimum operating temperature level 1200 oC 1 year spare parts bundle for complete maintainability 10m pipe

pipeline. 1100 litre fuel Storage tank +pipeline system Containerised (the container will certainly act as housing) Added chimney expansion

1 metre high One (1) year guarantee.

Burner of 20 Kg: 03 Devices

Electrically controlled burner.

Two-compartment burner with a power of 20 kg/ hour.

Incinerator with reduced maintenance and operating costs; Geared up with an automatic control panel in addition to very easy to make use of with

electro-magnetic locking of the door.

A main waste reduction chamber of 900 ° C. A blog article second burning chamber of gases created in the main chamber

in least 1100 ° C.

Carbon residues in ash much less than 5% by weight based on European Directive 2000/76/ EC.

With refractory cellular lining in goods of higher quality

Categories:

Recent Posts