Various Sorts Of Incinerators

Burner version C.
I000 Litre Gas Tank + Pipeline System, reveal amount.
Weight (kg), please indicate:.
10m Tube Pipeline, indicate length.
Chimney
Smokeshaft with a minimum elevation of 4 meters above floor level
Burn Price – – 150kg/hour minimum.
Gas Retention Time – – 2 Seconds. Fuel – Diesel/LPG/LNG, please indicate. Minimum working temperature 850 ° C, please indicate. One year Spare Components Bundle for whole maintainability. 10m Tube Pipeline, indicate length.
Control box that can be detached and put on different stand at least 1.5 meters from incineration at approximately 1.6 meter height

Burner version A.
Added smokeshaft growth, indicate elevation.
Second Chamber.
Diesel/LPG/LNG burning primary combustion chamber/primary burning area
Home time in the next chamber not less than 2 seconds
Added Chamber.

hazardous waste high fever incinerations for the therapy of contaminateds materials. The waste will certainly be blended, including medical, oily wastes, woods as well as lab wastes. Key combustion
Burn Price 65kg/h minimum.
Gas Retention Period 2 Seconds.
Second Chamber.
10m Tube Pipe, indicate length.
Fuel Diesel/LPG/LNG, please reveal.
Gas Retention Time – – 2 Seconds. Gas – Diesel/LPG/LNG, please suggest.
I000 Litre Gas Container + Pipe System, reveal amount.
Gas Retention Time – – 2 Seconds. Diesel/LPG/LNG, please suggest. Power Supply for Control Box- 220V-240V 50Hz solitary stage.
1000 Litre Fuel Tank + Pipeline System, indicate amount.
Service warranty, suggest no of years

Whole lot 4– High Temperature Waste Incinerator.
10m Pipe Pipe, reveal size.
Gas Diesel/LPG/LNG, please suggest.
Both main and the next temperature levels preserved till All of the waste was completely combusted
Added chimney growth, reveal height.
Burn Rate 50kg/h minimum.
1000 Litre Gas Tank + Pipeline System, indicate volume.
Secondary Chamber.
10m Hose Pipe, indicate dimensions.
Weight (kg), please indicate:.
Minimum working temperature 1200 ° C, please suggest.
Warranty, indicate no of years

Burner design B.
Mobile Incinerator model E.
Different and/or noticeable alert to warning the driver when the additional temperature drops to below the required temperature
HTW Incinerator design D.
Gas Retention Period 2 Seconds.
One year Spare Parts Package for complete maintainability.
Temperature level Cautions
Gas Retention Time – – 2 Seconds. Fuel – Diesel/LPG/LNG, please indicate. Minimum working temperature 850 ° C, please indicate. One year Spare Components Bundle for full maintainability.
Burn Rate 100kg/h minimum.
Mobile Burner model F.
Power Supply for Control Box 220V-240V, single stage 50-60Hz.
One year Spare Parts Package for full maintainability.
Warranty, reveal no of years

Whole lot 5– Mobile Burner.
1000 Litre Gas Storage Tank + Pipe System, reveal volume.
Weight (kg) please suggest:.
Additional chimney growth, indicate elevation.
Weight (kg), please show:.
General
Burn Price 250kg/h minimum.
Guarantee, indicate no of years

Lot 6– Mobile Incinerator.
Guarantee, reveal no of years

Great deal 7– High Temperature Waste Mobile Incinerator.
Added chimney extension, indicate elevation.
Burn Rate 100kg/h minimum.
Gas Retention Time – – 2 Seconds. Gas – Diesel/LPG/LNG, please suggest. Power Supply for – Control Box – 220V-240V 50Hz solitary stage. Minimum running temperature 850 ° C, please suggest. One year Spare Components Bundle for whole maintainability. 10m Hose pipe Pipe, show length.
HTW Mobile Incinerator design G.
1000 Litre Gas Storage Tank + Pipeline System, reveal amount.
I000 Litre Gas Tank + Pipe System, indicate volume.

Categories:

Recent Posts