Capacity less than 500Kg/hr.
The quotation should include supervising, beginning up and training of the ministry and operators of caregivers inside/outside Kuwait.
Doors ought to be lined with the same bricks, and the edges lined with special suitable insulation to avoid any gas escaping, as well as the doors should be kept under negative pressure during the procedure.
Feeding System Should be auto feeding system into primary chamber.
Refractory The chambers should be lined with high thermal insulating refractory bricks with suitable thickness and with exceptionally temp. resistance. Not less than 1400 C for the first combustion chamber, rather than less than 1600 C for the secandry combustion chamber, and in the same time stop the Temp. Of the exterior body of the chamber higher than 70 C.
Fuel It should be dual system, such as gas and natural gas.
Combustion chamber 2 combustion chamber.
Excess Oxygen concentration Of primary combustion chamber 3-6% maximum.
Inaddition The desigh should insure that reactive pest management control systems are used.
The incineration should be set up inside closed suitable building with good aeration and ventilation system. The construction has facilities for off-loading of wastes from transport vehicles.
Cooling System The primary chamber should be provided with automobile cooling systemthrough nozzles to permit direct cooling if the Temp.
Part-time time of the flow gases less than 2 Sec from the hot portion.
Noise Level Not more than 85 dBA during normal operation.
Sampling point ought to be equiped with a stage located down the sampling stage by a distance less than one m, and equiped with suitable staircase from ground to the port with comfy slope.
Temp. First combustion chamber 800-1000 C.
Chimney It should be suitable with all the ability and the technical specifications, with elevation less than 12m from ground level. With simple opennable sampling stage equal about 3 inch, and the best sampling locations is 8D downstream direction and 2D upstream from any flow disturbancies.
Secandry combustion chamber 1000-1200 C, with the option to be updated to 1400 C.
Ash Removal It should be automobile ash removal procedure.
Quenching system/Heat exchanger ought to be made and made from anti corrosion and acid assault materials such as stainless steel 316 or equivalent.
Inter-lock system The incineration should be equiped with inter-lock system to protect against feeding the waste into the primary chamber if the combustion Temp. less than 500 C.
Operation 24hr-7days/week constant operation.
Categories: