Day: October 3, 2019

An Incinerator is to be supplied by the Contractor on a rental basis at a location established by the Company. The Contractor is to provide trained and competent personnel with initial installation, commissioning and operational training under the supervision of the manufacturer’s technician. The incinerator is to be maintained and operated to manufacturer’s specifications by trained personnel. Contractor must have sufficient personnel trained and competent to operate the incinerator throughout the contract period. Specifications for the incinerator are attached in Appendix A. Incinerator Use/Ash Collection Incinerators used will be limited to daylight hours of operation. This includes shutdown, cleaning and maintenance. Waste streams shall not be mixed during the incineration process and the ash collection chamber will be cleaned when a different waste stream is to be incinerated. The Company will provide the contractor with a list of items that can be incinerated. All ash will be collected and stored in individual storage bins for each particular waste stream. The bins are to be provided by the contractor to the same design as the storage bins for the raw waste streams and include a lid design that prevents contamination from water. Ash from each waste stream will be sent for laboratory analysis after each initial incineration by the Company and at intervals decided by the Company thereafter. Contractor will be required to collect ash samples for analysis as directed by the Company. The Contractor will be responsible for the security of samples taken to prevent contamination until collection by the Company or designated courier. Ash will be disposed of at the direction of the Company. It is the responsibility of the Contractor to ensure the ash is not compromised until final disposal. Company will provide additional storage area for ash if and as required.
An Incinerator is to be supplied by the Contractor on a rental basis at a location established by the Company. The Contractor is to provide trained and competent personnel with initial installation, commissioning and operational training under the supervision of the manufacturer’s technician. The incinerator is to be maintained and operated to manufacturer’s specifications by trained personnel. Contractor must have sufficient personnel trained and competent to operate the incinerator throughout the contract period. Specifications for the incinerator are attached in Appendix A. Incinerator Use/Ash Collection Incinerators used will be limited to daylight hours of operation. This includes shutdown, cleaning and maintenance. Waste streams shall not be mixed during the incineration process and the ash collection chamber will be cleaned when a different waste stream is to be incinerated. The Company will provide the contractor with a list of items that can be incinerated. All ash will be collected and stored in individual storage bins for each particular waste stream. The bins are to be provided by the contractor to the same design as the storage bins for the raw waste streams and include a lid design that prevents contamination from water. Ash from each waste stream will be sent for laboratory analysis after each initial incineration by the Company and at intervals decided by the Company thereafter. Contractor will be required to collect ash samples for analysis as directed by the Company. The Contractor will be responsible for the security of samples taken to prevent contamination until collection by the Company or designated courier. Ash will be disposed of at the direction of the Company. It is the responsibility of the Contractor to ensure the ash is not compromised until final disposal. Company will provide additional storage area for ash if and as required.
An Incinerator is to be supplied by the Contractor on a rental basis at a location established by the Company. The Contractor is to provide trained and competent personnel with initial installation, commissioning and operational training under the supervision of the manufacturer’s technician. The incinerator is to be maintained and operated to manufacturer’s specifications by trained personnel. Contractor must have sufficient personnel trained and competent to operate the incinerator throughout the contract period. Specifications for the incinerator are attached in Appendix A. Incinerator Use/Ash Collection Incinerators used will be limited to daylight hours of operation. This includes shutdown, cleaning and maintenance. Waste streams shall not be mixed during the incineration process and the ash collection chamber will be cleaned when a different waste stream is to be incinerated. The Company will provide the contractor with a list of items that can be incinerated. All ash will be collected and stored in individual storage bins for each particular waste stream. The bins are to be provided by the contractor to the same design as the storage bins for the raw waste streams and include a lid design that prevents contamination from water. Ash from each waste stream will be sent for laboratory analysis after each initial incineration by the Company and at intervals decided by the Company thereafter. Contractor will be required to collect ash samples for analysis as directed by the Company. The Contractor will be responsible for the security of samples taken to prevent contamination until collection by the Company or designated courier. Ash will be disposed of at the direction of the Company. It is the responsibility of the Contractor to ensure the ash is not compromised until final disposal. Company will provide additional storage area for ash if and as required.
An incinerator represents a complete solution to the problem of disposal of all hospital waste types. The liquid fuel is diesel. The incinerator should meet the environment standards. Expected Technical specifications The incinerator shall be fully self contained.  The incinerator plant shall incorporate a control panel for its operation. On the control panel we shall have a visual display of the chamber temperatures. This visual display must control and monitor the incinerator and his performance. Capacity of destruction in weight shall be 60 Kg/h.  It should be able to operate not less than 10 hours/day This incinerator must be able to destruct all combustible wastes produced by hospitals, private clinics, laboratories, institutes, etc…  Design Specification : Types A, B, C, D, and E of medical waste  “PYROLYTIC” combustion, by controlling the gasification of waste.  The incinerator must avoid the release of black smoke and fine dust, during the loadings. It shall be able to reduce the volume of wastes by 98%. It shall be able to hold emission in the second burn with gas residence of not less than 2 seconds.  The incineration should be completely free from visible smoke as well as offensive odours.  1.0The primary ignition burner shall providing ignition of the waste to 850 °C and must switch off to conserve fuel. The primary combustion chamber shall be constructed from heavy steel plate and the unit is internally lined with a complete layer of hote face refractory and high efficiency insulation.  The Internal diameter of the Chimney at least: Ø 400 and its height: 8 m  The Volume of the combustion chamber at least: 1.200 L  The Dimension of the door for loading in cm at least: 70×70.  Burner operation should be Automatic On/Off  Fuel : diesel Manufacturer to provide  necessary information for the best of  the installation 
An incinerator represents a complete solution to the problem of disposal of all hospital waste types. The liquid fuel is diesel. The incinerator should meet the environment standards. Expected Technical specifications The incinerator shall be fully self contained.  The incinerator plant shall incorporate a control panel for its operation. On the control panel we shall have a visual display of the chamber temperatures. This visual display must control and monitor the incinerator and his performance. Capacity of destruction in weight shall be 60 Kg/h.  It should be able to operate not less than 10 hours/day This incinerator must be able to destruct all combustible wastes produced by hospitals, private clinics, laboratories, institutes, etc…  Design Specification : Types A, B, C, D, and E of medical waste  “PYROLYTIC” combustion, by controlling the gasification of waste.  The incinerator must avoid the release of black smoke and fine dust, during the loadings. It shall be able to reduce the volume of wastes by 98%. It shall be able to hold emission in the second burn with gas residence of not less than 2 seconds.  The incineration should be completely free from visible smoke as well as offensive odours.  1.0The primary ignition burner shall providing ignition of the waste to 850 °C and must switch off to conserve fuel. The primary combustion chamber shall be constructed from heavy steel plate and the unit is internally lined with a complete layer of hote face refractory and high efficiency insulation.  The Internal diameter of the Chimney at least: Ø 400 and its height: 8 m  The Volume of the combustion chamber at least: 1.200 L  The Dimension of the door for loading in cm at least: 70×70.  Burner operation should be Automatic On/Off  Fuel : diesel Manufacturer to provide  necessary information for the best of  the installation 
Recent Posts