|
|
Machine Working mode |
|
Oil or Gas + Ability |
Voltage |
|
220V |
Oil Intake (lit/hour) |
|
Average 13.3lit/hour/chamber |
Gas Intake (NG) (m3/hour) |
|
16.0 (m3/hour) (NG) |
Gas Intake (LPG) (m3/hour) |
|
11.7 (m3/hour) (LPG) |
Burning rate |
|
Average 30kg/hour |
Feed mode |
|
Guide |
Main Combustion Room |
|
360 Liters |
Secondary Combustion Room |
|
200 Liters |
Combustion Chamber Material |
|
Refractory Concrete Cement+firebrick |
Internal Measurements |
|
Yes (Main chamber) |
External Measurements |
|
210x120x210cm(without chimney) |
Door opening |
|
48X60 cm |
Fuel Type |
|
Diesel Oil/ Natural Gas /LPG |
Burner |
|
First |
Chimney length |
|
13.0 Meters |
Smoke filter Room |
|
Yes |
Temperature monitor |
|
Two figure Digital Screen |
Temperature protection |
|
Yes |
Oil tank |
|
200L |
Burning Efficiency |
|
>98% |
Chimney type |
|
Stainless Steel |
1st. |
|
800c–1000c |
2nd. Room temperature |
|
1000c–1200c |
Residency time |
|
2.0 sec. |
Gross weight |
|
4000kg |
Electrical Plastic and glasses Shredder |
|
Yes |
Scrubber |
|
Yes |
Warranty Stage |
|
1. Year |
Main combustion chamber |
|
Yes |
Secondary combustion chamber |
|
Yes |
Incinerator control case |
|
S. steel |
Incinerator chimney |
|
First |
Fuel Burner |
|
Yes |
Oil Tank ability |
|
Yes |
Oil Stand support |
|
Yes |
Dry Smoke Filter Chamber |
|
Yes |
Air Fan |
|
Yes |
Total waste incineration capacity/time |
Minimum 60KG
for Ministry of Public Health, Kabul, Afghanistan
Tel: +86-25-8461 0201
Website: www.hiclover.com
Email: [email protected]
Email: [email protected]
2020-06-30