Our normal activities generates 2-5 tons of assorted waste materials per day which range from condemned carcasses, and medical incinerator primary combustion price other wastes all which need to be incinerated at above 800Centigrade measured flue exhaust gas.To be used by small hospitals and clinics to safely dispose of infectious and pathological wastes. Load Capacity […]
Capacity Not less than 500Kg/hr. Operation 24hr-7days/week continuous operation. Combustion chamber 2 combustion chamber. Temp. First combustion chamber 800-1000 C. Secandry combustion chamber 1000-1200 C, with the possibility to be upgraded to 1400 C. Combustion Efficiency 99.99% Retention time Of the flow gases not less than 2 Sec in the hot portion. Excess Oxygen concentration […]
1 Basic Plant Design An approved plant must have four distinct sections that demonstrate three principles of Turbulence, Residence Time and Temperature are inbuilt in the plant design .The regulated sections may include but not limited to: Overall plant layout. Feed chamber/ charging Primary Combustion Chamber. Secondary Combustion Chamber. Particulate Scrubbers Acid Gas Scrubbers The […]
the following containerized incinerators. (Kitchen and accommodation and grey water and black water plant removing waste) we need incinerator is each function separate are all in one incinerator we need informed. Plant we installing for our accommodation barge used in an offshore marine construction project. 200 People would be accommodated onboard. WASTE INCINERATORS RECOMMENDATIONS china […]
waste incinerator manufacturer china, Waste chamber Chamber capacity 300 kg Chamber volume .54m3 Chamber size (outside) Width: 91cm, Height: 86cm Length: 152cm Door opening 66 x 76 cm Height to door 84 cm Height to top of stack 5.4 m Suggested slab size (L x W x Thickness) 1.8 m x 2.4 m x 10 […]