Gasified incineration for burning medical wastes. Fuel type: Natural Gas Burning Capability: – 30-50 kg/time – Daily 3-6 times Incinerator size: max 2000x1200x3200 mm Burning room volume: – Gasification room max 0.7 m3, – Secondary burning room max 0.5 m3, Size of the filling entrance: max 650×850 mm Air blower: max 0,5 […]
Incinerator to burn nearly 10ton(10,000kg) of tobacco waste dust) from a tobacco processing plant. Requirements: Incinerator system complete with scrubber, pollution control system, water system, loading system, ash removing system and if anything more option is available. we have to burn 10000kgs/day, We work 8 hours a day, so your incinerator should have capacity […]
Technical Specifications Pre-assembled, containerized type —yes, do not included chimney installation. Burning rate: 100 – 120kg / hour —yes Minimum operating temperature: 8500c (Primary combustion) —800-1000 degree Maximum operating temperature: 14500c (afterburner chamber) —1000-1200 degree Secondary Burning capacity: Compulsory. —yes Density insulation: 20 mm high —50mm Refractory casting: minimum […]