Day: May 21, 2015

Gasified incineration for burning medical wastes.   Fuel type: Natural Gas Burning Capability: –   30-50 kg/time –   Daily 3-6 times   Incinerator size: max 2000x1200x3200 mm Burning room volume: –   Gasification room max 0.7 m3, –   Secondary burning room max 0.5 m3,   Size of the filling entrance: max 650×850 mm Air blower: max 0,5 […]
  Incinerator to burn nearly 10ton(10,000kg) of tobacco waste dust) from a tobacco processing plant. Requirements: Incinerator system complete with scrubber, pollution control system, water system, loading system, ash removing system and if anything more option is available. we have to burn 10000kgs/day, We work 8 hours a day, so your incinerator should have capacity […]
Technical Specifications Pre-assembled, containerized type —yes, do not included chimney installation.   Burning rate: 100 – 120kg / hour —yes   Minimum operating temperature: 8500c (Primary combustion) —800-1000 degree   Maximum operating temperature: 14500c (afterburner chamber) —1000-1200 degree   Secondary Burning capacity: Compulsory. —yes   Density insulation: 20 mm high —50mm   Refractory casting: minimum […]
Recent Posts